"Outdoor things indoors, do the things above ground, dangerous complex machine to do, do not do the things that pollute the environment," described here is the construction of steel structure residential building process.
"Average two and a half days to three days a, less than two years for a time period of 27.5 million square meters has entered the final mechanical and electrical equipment installation, debugging, and indoor decoration stage." On September 23, by construction of Hangxiao Co., Ltd of Baotou million County, most of the city one phase of the project opened, the construction speed is quick, the construction way of unique caused social attention.
In fact, early in 2008, Hangxiao steel structure is in Xiaoshan built 24 layer Hangxiao collective apartment, 2009. Their construction of the largest steel structure residential group -- Wuhan century homes overall completion and consign is used. As a science and technology demonstration projects, to this day, it is still our country has delivered the largest steel structure residential group.
In the society as a whole there is no cognitive environment, Hangxiao steel structure with great courage and wisdom plunge into steel structure residential areas, more than ten years perseverance investment heavily in research and development, establish complete independent intellectual property of steel structure residential system, thus breaking a new path for China s construction of industrialization, the industrialization of residential development. In the energy saving and emission reduction pressure is increasing, the iron and steel industry overcapacity, and vigorously develop the green building today, large-scale promotion of steel structure is imperative. Let us approach the Wuhan century homes, approached with independent intellectual property rights, has been low-key stealth in the steel structure residential group, also hopes to enhance social awareness of the steel structure residence.